Cryan Landscape was the main contractor for the entire site project at Bishop Feehan High School
( we worked with up to 5 other contractors )
Cryan Landscape worked with BFHS, engineers and contractors to sort out their needs; assist with design, coordinate with City of Attleboro, complete necessary paperwork, attend meetings, etc.
Guardrail System installed by Citiworks, Inc.
Asphalt by Walsh Contracting & Pawtucket Asphalt
Site work assistance from Walsh Contracting
Boro Sand & Stone and Sullivan Concrete
Existing customer site project; review project, evaluate options
Work with engineer, landscape design
Budget costing, preliminary cost review
Value engineering design, bidding process
Tree clearing, stump removal and disposal
Site grading
Excess soil removed, rock & boulders
Excavation for drainage, drainage installation
Curbing
Concrete walkways
Electrical trenching
Light base setup
Drainage extension and rebuilding of existing
Landscaping ( loam install, tree install, lawn ) and seeding
Parking lot line striping
Parking stoppers installed
Partial area completion for winter use
Continued work thru winter 2019
We are the One Source Solution for all your high-end excavation and improvement projects